Govt sets an ambitious target of 40GW by 2022 for Solar Rooftops and allocates 750 MWp rooftop subsidy to SECI

Allocation  of target  for 750 MWp grid connected solar rooftop projects with subsidy and 500 MWp without subsidy to Solar Energy Corporation of India

Government  of India has set a target of installing  40 GW grid connected  solar rooftop systems in the country by 2022. The ongoing ‘Grid Connected  Rooftop and Small Solar Power Plants Programme’  aims  to  promote  installation  of grid  connected  solar rooftop  systems  in residential, industrial, commercial  and institutional sectors in the country

Click here for the document

About Ritesh Pothan

Ritesh Pothan, is an accomplished speaker and visionary in the Solar Energy space in India. Ritesh is from an Engineering Background with a Master’s Degree in Technology and had spent more than a decade as the Infrastructure Head for a public limited company with the last 9 years dedicated to Solar and Renewable Energy. He also runs the 2 largest India focused renewable energy groups on LinkedIn - Solar - India and Renewables - India
This entry was posted in Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Ministry of Power, Power Generation, PV, Renewables, Residential, Rooftop, Solar, Solar Policy and tagged , , , , , , , , , , , , , , . Bookmark the permalink.