Category Archives: Solar Pumps

Benchmark Cost for “Off-grid and Decentralized Solar PV Applications Programme” for the year 2017-18

In continuation of this Ministry’s sanction order number 5/23/2009-P&C (Pt. Ill) dated 3rd November  2014 reg. additions/amendments  in the  above  mentioned  scheme,  I am  directed to convey the sanction of the President of India for the revised Benchmark Cost with … Continue reading

Posted in Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Ministry of Power, MNRE, Policy, PV, Renewables, Residential, Rooftop, Rural Lighting, Solar, Solar Pumps | Tagged , , , , , , , , , , | Leave a comment

How will GST impact Solar Projects in India

Implications-of-GST-on-delivered-cost-of-Renewable-Energy Executive summary Multiple Indirect taxes are currently levied on transactions in India. Some of the taxes are levied and collected by the Central Government, while other taxes are collected by the State Governments. Accordingly, the current Indirect tax regime … Continue reading

Posted in Bagasse, Biofuels, Biomass, CERC, Cogeneration, Geothermal, Grid Connected, Grid Interactive Distributed Solar Energy Systems, Hydro, India, Maharashtra, MNRE, Power Generation, PV, Renewables, Solar, Solar Parks, Solar Policy, Solar Pumps, Waste, Waste To Energy, Wind | Tagged , , , , , , , , , , , , , , , , , , , , | Leave a comment

STATE WISE LIST OF LOWEST DISCOVERED PRICES (TENTATIVE) FOR SECI 500 MW ROOFTOP TENDER

STATE WISE LIST OF LOWEST DISCOVERED PRICES (TENTATIVE) FOR SECI 500 MW ROOFTOP TENDER S.No Name of the State State wise lowest Price discovered PART A (Rs./kW) PART B (Rs/kWhr) PART C (Rs./kW) 1 Andaman & Nicobar Islands 74950 2 Andhra Pradesh 59950 5.25 62100 3 Bihar 71900 71270 4 Chandigarh 55500 3 … Continue reading

Posted in MNRE, PV, Rooftop, SECI, Solar Policy, Solar Pumps | Tagged , , , , , , , , | Leave a comment

Programme/ Scheme wise Physical Progress in 2016-17 (& during the month of June, 2016)

Ministry of New & Renewable Energy Programme/ Scheme wise Physical Progress in 2016-17 (& during the month of June, 2016) Sector FY- 2016-17 Cumulative Achievements Target Achievement (as on 30.06.2016) I.   GRID-INTERACTIVE POWER (CAPACITIES IN MW) Wind Power 4000.00 373.95 … Continue reading

Posted in Bagasse, Biofuels, Biomass, India, Power Generation, PV, Renewables, Rooftop, Rural Lighting, Solar, Solar Parks, Solar Policy, Solar Pumps, Solar PV | Tagged , , , , , , , , , , , , , | Leave a comment

Draft of Indian Renewable Energy Act 2015

Request for comments/observations/feed-back on the Draft Renewable Energy Act 2015 In October 2014, the Ministry of New and Renewable Energy (MNRE) had constituted an Expert Committee to provide a draft Renewable Energy Act. The Committee met on 7 November 2014, … Continue reading

Posted in Commercial, Government, India, Industrial, JNNSM, Manufacturing, Ministry of Power, Prime Minister, PV, Residential, Rooftop, Solar, Solar Parks, Solar Policy, Solar Pumps, Solar Thermal, Tidal, Transmission and Distribution, Waste, Waste To Energy, Wind | Tagged , , , , , , , , , , , , , , ,

TELANGANA SOLAR POWER POLICY 2015

APPLICABILITY OF THE POLICY This solar policy shall be applicable for the following solar projects set up within the state- 1) Solar Power Projects (SPPs) a) Grid connected solar power projects based on both Photo Voltaic (PV) as well as … Continue reading

Posted in DISCOM, Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Net Metering, Power Generation, Renewables, Residential, Rooftop, Solar, Solar Parks, Solar Policy, Solar Pumps, Telangana, Telangana, Transmission and Distribution | Tagged , , , , , , , , , , , , , , , , , , , , , , , , ,

India’s solar dream fuelled by global trends

The country plans to install 100 GW capacity of solar-generated electricity by 2022, a five-time increase from a previous target. India’s plan to install 100 GW capacity of solar-generated electricity by 2022, a five-time increase from a previous target, only … Continue reading

Posted in Batch I, Batch II, Climate Change, Coal, Commercial, Crystalline, Fossil Fuel, Global Warming, Grid Connected, Grid Interactive Distributed Solar Energy Systems, JNNSM, Phase I, Phase II, Power Generation, PV, Renewables, Residential, Rooftop, Rural Lighting, Solar, Solar Parks, Solar Pumps, Solar Thermal, Thin Film, Tranche I | Tagged , , , , , , , , , ,