Tag Archives: Delhi

Commissioning Status of Grid Connected Solar Power Projects under JNNSM upto 31st March 2016

Commissioning Status of Grid Connected Solar Power Projects under JNNSM Sr. No. State/UT Total cumulative commissioned capacity till 31-03-15 (MW) Total commissioned capacity during 2015-16 (MW) Total cumulative commissioned capacity till 31-03-16 (MW) 1 Andhra Pradesh 137.852 435.114 572.966 2 Arunachal Pradesh 0.025 0.240 0.265 3 Bihar 0 5.100 … Continue reading

Posted in Grid Interactive Distributed Solar Energy Systems, India, JNNSM, Power Generation, PV, Renewables, Solar | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Solar tariff trend in India from 2010-2016

Trend of Solar Tariff Previous bid results     Year Capacity on Offer (MW)   Highest Bid (Rs./KWh)   Lowest (Rs./KWh)   Weighted Avg. Price (Rs./KWh) NSM Batch 1 Dec’10 150 12.76 10.95 12.16 NSM Batch2 Dec’11 350 9.39 7.49 … Continue reading

Posted in Batch I, Batch II, Government, JNNSM, Phase I, Phase II, Power Generation, PV, Renewables, Solar, Solar Parks, Tranche I | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Commissioning Status of Grid Connected Solar Power Projects under JNNSM in 2015-16

Commissioned in 2015-16 as on 31/01/2016 Commissioning Status of Grid Connected Solar Power Projects under JNNSM in 2015-16   Sr. No.     State/UT Total MNRE Projects MW   State Policy MW   RPO MW   REC Scheme MW Pvt. … Continue reading

Posted in Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Karnataka, Madhya Pradesh, Maharashtra, New Delhi, Power Generation, Punjab, PV, Rajasthan, Renewables, Solar, Telangana, Uttar Pradesh | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Commissioning Status of Grid Connected Solar Power Projects as on 31 Jan 2016

Cumulative Commissioned as on 31-01-2016  Commissioning Status of Grid Connected Solar Power Projects     Sr. No.     State/UT   Total MNRE Projects MW   State Policy MW     RPO MW   REC Scheme MW   Pvt. Initiative … Continue reading

Posted in Andhra Pradesh, Bihar, Government, Grid Interactive Distributed Solar Energy Systems, Gujarat, Haryana, India, JNNSM, Karnataka, Madhya Pradesh, Maharashtra, Ministry of Power, MNRE, New Delhi, Power Generation, Punjab, PV, Rajasthan, Renewables, Solar, Solar PV, Telangana, Uttar Pradesh | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Air pollution 5th largest killer in India: Study

(The study has claimed that…) Air pollution is the fifth largest killer in India taking 6.2 lakh lives per year and Delhi is among one of the five most critically polluted regions in the country, a study by a US-based … Continue reading

Posted in Global Warming, News | Tagged , , , , , ,

Amendment in the Benchmark cost of “Off-grid and Decentralized Solar Applications Programme” being implemented under the Jawaharlal Nehru National Solar Mission (JNNSM) till 31st March, 2014

No. 5/23/2009-P&C भारत सरकार/ Government of India नवीन और नवीकरणीय ऊर्ाामंत्रालय / Ministry of New & Renewable Energy *** To The Pay & Accounts Officer Block No.14, C.G.O. Complex, Lodhi Road, New Delhi-110003, dated the 28th May, 2013 Ministry of … Continue reading

Posted in Off-grid, Renewables, Solar, Solar Thermal | Tagged , , , , , , , , , , , ,

Delhi drops subsidy on Solar

In a move that may discourage residents to opt for solar energy, the Delhi government has discontinued the subsidy it used to offer on the installation of solar panels from April 1. The new move comes at a time when the … Continue reading

Posted in Solar, Solar Thermal | Tagged , , , , , , , , , , , , | 1 Comment