Tag Archives: solar blog india

Commissioning Status of Grid Connected Solar Power Projects under JNNSM in 2015-16

Commissioned in 2015-16 as on 31/01/2016 Commissioning Status of Grid Connected Solar Power Projects under JNNSM in 2015-16   Sr. No.     State/UT Total MNRE Projects MW   State Policy MW   RPO MW   REC Scheme MW Pvt. … Continue reading

Posted in Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Karnataka, Madhya Pradesh, Maharashtra, New Delhi, Power Generation, Punjab, PV, Rajasthan, Renewables, Solar, Telangana, Uttar Pradesh | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION (PSERC) Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2015-16

Levellised Fixed Cost (₹/kWh) Variable Cost (FY 2015-16) (₹/kWh) Applicable Tariff Rate (₹/kWh) Benefit of Accelerated Depreciation, if availed (₹/kWh) Net Applicable Tariff Rate upon adjusting for Accelerated Depreciation benefit (3-4) (₹/kWh) 1 2 3 4 5 Biomass Power Projects(other … Continue reading

Posted in Biofuels, Biomass, Commercial, CSP, DISCOM, Grid Interactive Distributed Solar Energy Systems, Hydro, India, Industrial, Punjab, PV, Renewables, Solar, Solar Parks, Solar Policy, Wind | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Joint Regulatory Commission for Goa and Union territories (JERC) has determined the solar tariff for ground-mounted and rooftop solar projects

Tariff is applicable for projects in the State of Goa and the Union Territories of Andaman and Nicobar Islands, Chandigarh, Dadra & Nagar Haveli, Daman & Diu, Lakshadweep, and Puducherry. Click Here for the Full document

Posted in Climate Change, DISCOM, Government, India, JERC, Ministry of Power, MNRE, Net Metering, PV, Renewables, Residential, Rooftop, Solar, Solar Policy | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Implementation of Scheme for setting up over 300 MW of Grid-Connected & Off-grid Solar PV Power Projects by Defence Establishments under Ministry of Defence and Para Military Forces (under MHA) with Viability Gap Funding (VGF) under Phase-II/III of JNNSM during 2014-15 and onwards

Applicability: The capacity  of 300 MW of Grid-Connected  and off-Grid  Solar PV power projects,   will  be  set  up  in  various  Establishments  of  Ministry  of  Defence  i.e Establishments of Army,  Navy, Air Force, Ordnance Factory  Board,  Defence Laboratories and Defence PSUs … Continue reading

Posted in Armed Forces, Crystalline, Defence Ministry, Government, Grid Interactive Distributed Solar Energy Systems, Grid Storage, India, MNRE, PV, Renewables, Rooftop, Solar, Solar Parks, Subsidy, Thin Film, VGF | Tagged , , , , , , , , , , , , , , , , ,

Natural Group Presentation at SolarTech – Solar Energy Policy July 2014 – Next Steps for Solar

Click here for the entire presentation Natural Group_Presentation at SolarTech – Solar Energy Policy July 2014 My presentation at Solartech 2014 encompassed the next steps for Solar in India moving forward. A few suggestions include A. Focus has to be … Continue reading

Posted in Commercial, DISCOM, Grid Connected, Presentations, Renewables, Ritesh Pothan, Solar, Transmission and Distribution | Tagged , , , ,

NSEFI Letter to SECI and MNRE regarding Issues with DCR category projects under JNNSM Phase II, Batch I

Ref. No.: NSEFI/08/MNRE/2014 Date: March 24, 2014 Shri Tarun Kapoor, I. A. S., Jt. Secretary, Government of India, Ministry of New and Renewable Energy, Block-14, CGO Complex, Lodhi Road, New Delhi-110 003, India Dear Sir, Subject: Domestic Content Requirement (DCR) … Continue reading

Posted in Batch I, Commercial, Grid Connected, JNNSM, MNRE, Phase II, Power Generation, PV, Renewable Purchase Obligation, Renewables, SECI, Solar, Subsidy | Tagged , , , , , , , , , , , , | 3 Comments

Tamil Nadu Solar Consultation Meeting On 23.11.12 2 4.30 pm With Solar Power Developers / Bidders Points Discussed

tamil-nadu-consultation-meeting-on-23-11-12-2-4-30-pm.pdf It is proposed by TANGEDCO to procure 1000 MW of solar power from the solar power developers / bidders through competitive bidding route. • Capacity requirement is 1 MW and above. • EMD is Rs.7 lakhs per MW in … Continue reading

Posted in PV, Renewables, Solar, Tamil Nadu | Tagged , , , , , , , , ,