Tag Archives: solar power projects

Benchmark Cost for “Off-grid and Decentralized Solar PV Applications Programme” for the year 2017-18

In continuation of this Ministry’s sanction order number 5/23/2009-P&C (Pt. Ill) dated 3rd November  2014 reg. additions/amendments  in the  above  mentioned  scheme,  I am  directed to convey the sanction of the President of India for the revised Benchmark Cost with … Continue reading

Posted in Government, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Ministry of Power, MNRE, Policy, PV, Renewables, Residential, Rooftop, Rural Lighting, Solar, Solar Pumps | Tagged , , , , , , , , , , | Leave a comment

Policy for Net-Metering based Solar Rooftop Applications, Madhya Pradesh, 20

MP finally comes up with a draft for rooftop solar albeit lacklustre, just the few provisions below are barely adequate as a plan INCENTIVES Installation of SRPs under the policy shall be exempted from banking, wheeling and cross- subsidy surcharges … Continue reading

Posted in Climate Change, DISCOM, Grid Connected, India, Madhya Pradesh, Renewables, Rooftop, Solar, Solar Policy, Subsidy | Tagged , , , , , , , , , , | Leave a comment

SECI DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS

SOLAR ENERGY CORPORATION OF INDIA LIMITED DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS Scheme with aggregate capacity of 1000 MWp rooftop solar PV system.  Two Models – CAPEX … Continue reading

Posted in Government, India, MNRE, Power Generation, Renewables, Rooftop, Solar, Subsidy | Tagged , , , , , , , , , , | Leave a comment

Draft Guidelines for Tariff Based Competitive Bidding Process for Grid Connected Solar PV Power Projects – 2016

Objectives of the Guidelines Promotion of competition in the electricity industry in India is one of the key objectives of the Electricity Act, 2003. Power purchase costs constitute the largest cost element for distribution licensees. Competitive procurement of electricity by … Continue reading

Posted in DISCOM, Grid Connected, Grid Interactive Distributed Solar Energy Systems, India, Policy, Power Generation, Regulations and Procedures, Renewables, Solar | Tagged , , , , , , , , , , , | Leave a comment

National Solar Mission – Implementation of State-Level Solar Rooftop Photovoltaic Programs in India – Best Practise Guide

National Solar Mission Implementation of State-Level Solar Rooftop Photovoltaic Programs in India The Ministry of New and Renewable Energy (MNRE), Government of India has announced an ambitious solar target of 100,000 megawatts (MW) installed capacity by 2022, of which 40,000 … Continue reading

Posted in DISCOM, Grid Interactive Distributed Solar Energy Systems, India, MNRE, Net Metering, Regulations and Procedures, Renewables, Residential, Rooftop, Solar | Tagged , , , , , , , , , , , | 2 Comments

Commissioning Status of Grid Connected Solar Power Projects under JNNSM upto 31st March 2016

Commissioning Status of Grid Connected Solar Power Projects under JNNSM Sr. No. State/UT Total cumulative commissioned capacity till 31-03-15 (MW) Total commissioned capacity during 2015-16 (MW) Total cumulative commissioned capacity till 31-03-16 (MW) 1 Andhra Pradesh 137.852 435.114 572.966 2 Arunachal Pradesh 0.025 0.240 0.265 3 Bihar 0 5.100 … Continue reading

Posted in Grid Interactive Distributed Solar Energy Systems, India, JNNSM, Power Generation, PV, Renewables, Solar | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Central Electricity Regulatory Commission hereby makes the following regulations to amend the Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010

Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI  Dated: 28th March, 2016   NOTIFICATION No. L-1/12/2010-CERC: In exercise of powers conferred under Section 178 of the Electricity … Continue reading

Posted in Biomass, CERC, Cogeneration, Hydro, India, Power Generation, Renewable Energy Certificates, Renewables, Solar, Wind | Tagged , , , , , , , , , , , , , , ,